Nestlé Purina Hungary dry food plant design 2.
The extensions and modifications to the dry plant covered an area of nearly 12,000 m2: a 36m high steel silo tower, a 38m high Process tower and a 42m high second mill tower were added to the existing 32m high steel structure mill tower, which is made of reinforced concrete up to 20m high and steel structure above.
In addition, new warehouses (750 m2) have been built to meet logistical needs, and a nearly 1,000m2 electrical and mechanical building extension has been completed to meet increased electrical and mechanical needs. These were mixed reinforced concrete and steel structure hall buildings, typically less than 20m in height, taking into account the connected buildings and the possibilities.
The project was exceptionally difficult and complex, both in the design and construction phases.
Design of the BMW factory in Debrecen
We are honoured to have been commissioned by Synergy Ltd., one of the contractors of the BMW factory in Debrecen, to participate in the design process of four buildings. We were involved in the design of the buildings in two phases, which required different architectural and structural approaches.
In the first phase, we carried out the production and detail design of the Energy module, and in the second phase, the general design of the Logistics and High Storage building.
It is always a pleasure for us to develop long-term relationships, as this is also a positive feedback for us.
Video
Source: BMW Group Gyár Debrecen