Nestlé – Balaton PPVD Expansion of dry food plant
About the project
- Year 2020-2022
- Type of work General, Architecture, Support structure, Licensing, Detailed design, manufacture
- Contractor Synergy Construction Hungary Kft.
- Investor Nestlé Hungária Kft.
- Location Bük, Vas, Hungary
About the project
New PPVD (Pro Plan Veterinary Diets) technology was installed in the existing dry feed factory, requiring the redesign and extension of existing buildings and the design of three new buildings, which were located above, between and across the buildings of the factory, which were in continuous operation during the construction.
Even for a brownfield project, the project required a complex and precise approach, with several minor and major modifications and extensions over the years. The difficulty of the work was compounded by the frequently changing and evolving needs of the client.
It is interesting to note that the new mill tower was founded with micro piles in the basement of the existing building and from there it reaches a height of 40 m by passing through the existing ~12 m high building.