Ceasar House
About the project
- Year 2000
- Type of work Structural design design documentation
- Investor Autóker Holding Rt.
- Client Mérték Építészeti Stúdió Kft.
- Location Budapest, Pest, Hungary
About the project
The foundation of the building was constructed with piles and pile groups. The superstructure is a monolithic reinforced concrete frame structure, with the buildings forming a separate dilatation unit.
ARCHITECTURE
Mérték Építészeti Stúdió Kft.






