M Mérnöki Iroda Kft. logo
  • Home
  • News
  • About us
  • Company details
  • Colleagues
  • References
  • Awards
  • Videos
  • Contact
  • Magyar

Ceminvest - Switch to coal firing

About the project

  • Year 2003
  • Type of work General planning, Building permit plans, Construction plans
  • Investor Duna-Dráva Cement Kft. beremendi gyára
  • Client Duna-Dráva Cement Kft.
  • Location Beremend, Baranya, Hungary

About the project

The conversion to coal firing included the design of the following structures: a wagon unloader, a bridge structure supporting a conveyor belt with a total length of 145 m connecting the wagon unloader and the existing cement silos, the conversion of two former cement silos for the storage of petroleum coke and raw coal, the complete design of a coal grinding mill, the design of 2 coal silos of 1000 t, the support structure of a 132 m long hot gas pipeline.

TECHNOLOGY
Ceminvest Kft.

Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
Ceminvest - Switch to coal firing
M Mérnöki Iroda Kft. footer logo
© Copyright M Mérnöki Iroda Kft.