- Year 2003
- Type of work General planning, Building permit plans, Construction plans
- Investor Duna-Dráva Cement Kft. beremendi gyára
- Client Duna-Dráva Cement Kft.
- Location Beremend, Baranya, Hungary
About the project
The conversion to coal firing included the design of the following structures: a wagon unloader, a bridge structure supporting a conveyor belt with a total length of 145 m connecting the wagon unloader and the existing cement silos, the conversion of two former cement silos for the storage of petroleum coke and raw coal, the complete design of a coal grinding mill, the design of 2 coal silos of 1000 t, the support structure of a 132 m long hot gas pipeline.