DDC - Switch to coal firing

About the project

  • Year 2003
  • Type of work General planning, Building permit plans, Construction plans
  • Investor Duna-Dráva Cement Kft. váci gyára
  • Client Duna-Dráva Cement Kft.
  • Location Vác, Pest, Hungary

About the project

High-rise construction construction volume: 1.5 billion HUF

The work included the design of a new hall building for the reception of wagon unloading equipment, the design of the conveyor system between the coal storage hall and the wagon unloading hall, the design of the automatic loading equipment for the coal storage hall, the design of the transport track system between the coal storage hall and the coal mill, the design of the coal mill, the design of the hot gas pipeline for the transport of raw coal between the coal mill and the heat exchange tower, the design of 2 coal dust silos of 1 000 t.

TECHNOLOGY
Ceminvest Kft.

ARCHITECTURE
Aedis Kft.

DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
DDC - Switch to coal firing
M Mérnöki Iroda Kft. footer logo
© Copyright M Mérnöki Iroda Kft.