Biomass Energy Plant
About the project
- Year 2014
- Investor SC Holzindustrie Schweighofer s.r.l.
- Client Kész Kft.
- Location Mohács, Baranya, Hungary
About the project
Conversion of an existing boiler house to accommodate a new 30 MW biomass energy centre and support structures for the process equipment around the building: - Chip storage - Ash loading hall - Conveyor belts - Fan and chimney foundation
The construction of the boiler took nearly eight months, with over 80 truckloads of equipment arriving at the site.
Approximately 1 000 m3 of concrete and 18 tonnes of structural steel were installed.